Lower Energy and Maintenance Costs with ARP Humidification Systems

Located in the heart of Grand Rapids, the Pew campus of Grand Valley State University provides students with access to resources such as businesses, hospitals, and government agencies for internships and research, serving as a powerful resource for students to compete in today's knowledge-based economy. The Challenge The engineering firm contracted as...
Read More
Case Study: Epsilon Packaged Mechanical Plant for Hospital

6

Sep 17

Epsilon Packaged Mechanical Plant for Holy Cross Hospital

The Challenge Hospitals are heavily regulated in terms of their size, total number of beds, the services they can provide, and fees they can charge. Given these regulations, it is a challenge to maximize the value of the facility. Hospital facilities are built to last a long time and are...
Read More
Factory built central utility plants by Climate Technologies and Epsilon

15

Feb 17

GM M5 Project – Chilled Water Plants

When General Motors and their contractor Barton Malow needed three 7,500 Ton Chilled Water Plants for expansions at the GM plants in Fort Wayne, IN, Arlington, TX, and Flint, MI, they turned to Climate Technologies and Epsilon to design and fabricate modular central utility chilled water plants. The chilled water plant...
Read More

16

Jun 12

Scotch Marine Boilers Delivered to Robert Bosch Corp

Two Scotch Marine boilers were delivered to the Robert Bosch Corporation building in Farmington Hills, MI. Climate Technologies worked in conjunction with Robert Carter Mechanical on this project.
Read More

20

Aug 10

AVL America, GM Powertrain Prove Out Center

Climate Technologies has delivered a 650 horsepower -40F M&M Refrigeration chiller and low temperature secondary fluid pumping package to AVL America. The chiller will provide the low temperature fluid for prove out testing of the components for General Motors new state of the art powertrain testing facility to be built...
Read More

10

Feb 10

Helicopter Airlifted Dunham Bush Chillers

Five Dunham Bush chillers were airlifted via a helicopter at 333 Fort Street Detroit, MI. John Hale of Great Lakes Mechanical and Walt Zimmerman, President of Climate Technologies, worked together to provide a quality installation. These chillers were lifted 20 stories high to the top of the building while all...
Read More