Our Recent Projects

Factory built central utility plants by Climate Technologies and Epsilon

GM M5 Project – Chilled Water Plants

When General Motors and their contractor Barton Malow needed three 7,500 Ton Chilled Water Plants for expansions at the GM plants in Fort Wayne, IN, Arlington, TX, and Flint, MI, they turned to Climate Technologies and Epsilon to design and fabricate modular central utility chilled water plants. The chilled water plant shown (GM Fort Wayne) was installed in only two and one-half weeks. (more…)
Read More

Scotch Marine Boilers Delivered to Robert Bosch Corp

Two Scotch Marine boilers were delivered to the Robert Bosch Corporation building in Farmington Hills, MI. Climate Technologies worked in conjunction with Robert Carter Mechanical on this project.
Read More

AVL America, GM Powertrain Prove Out Center

Climate Technologies has delivered a 650 horsepower -40F M&M Refrigeration chiller and low temperature secondary fluid pumping package to AVL America. The chiller will provide the low temperature fluid for prove out testing of the components for General Motors new state of the art powertrain testing facility to be built in Pontiac, MI.
Read More

Helicopter Airlifted Dunham Bush Chillers

Five Dunham Bush chillers were airlifted via a helicopter at 333 Fort Street Detroit, MI. John Hale of Great Lakes Mechanical and Walt Zimmerman, President of Climate Technologies, worked together to provide a quality installation. These chillers were lifted 20 stories high to the top of the building while all streets in the area were blocked and guarded by the Detroit Police Department.
Read More